Multiple locations across Norway that are ready for development
Our Data Centers
100%
Powered by hydro-energy
25 MW
Additional available
Installed
15 MW
Polar has secured powered land in the southeast region of Norway with permits pre-approved for a data center modular facility. The team are standing by, ready to receive your specifications for capacity quick deployment.
Data Center DRA01
-
Electronic access control
-
CCTV
-
24 x 7 secured building
-
High permitter fences
-
Alarm system with AI detection
Security
-
Energy capacity: 20MVA installed with a potential additional 30 MVA
-
Energy source: 100% hydro power
-
Design: 2N Utility power. N+1 Electrical Infrastructure. N+1 Cooling 100%
-
Free Cooling and Heat Re-use. N+2 Fan Wall or direct liquid cooling options for HPC
-
Target PUE: 1.10
Specification
-
Location: NO2 region | 219km from Oslo
-
Plot: 60’600m2
-
Highly connected and resilient interconnectivity
-
Built-out state: Primary electrical infrastructure operational. Land prepared and ready for construction. Build to suit option available
-
Office space: Built in 2022
Facility
100%
Powered by hydro-energy
25 MW
Additional available
Installed
15 MW
Polar has secured powered land in the southeast region of Norway with permits pre-approved for a data center modular facility. The team are standing by, ready to receive your specifications for capacity quick deployment
Data Center DRA01
-
Electronic access control
-
CCTV
-
24 x 7 secured building
-
High permitter fences
-
Alarm system with AI detection
Security
-
Energy capacity: 20MVA installed with a potential additional 30 MVA
-
Energy source: 100% hydro power
-
Design: 2N Utility power. N+1 Electrical Infrastructure. N+1 Cooling 100%
-
Free Cooling and Heat Re-use. N+2 Fan Wall or direct liquid cooling options for HPC
-
Target PUE: 1.10
Specification
-
Location: NO2 region | 219km from Oslo
-
Plot: 60’600m2
-
Highly connected and resilient interconnectivity
-
Built-out state: Primary electrical infrastructure operational. Land prepared and ready for construction. Build to suit option available
-
Office space: Built in 2022
Facility
100%
Powered by hydro-energy
100 MW
Additional available
Installed
20 MW
Polar has secured a strategically placed site in the Southwestern region of Norway. With a history of manufacturing, this is an ideal facility to convert into data center space.
Data Center DAL01
100%
Powered by hydro-energy
100 MW
Additional available
Installed
20 MW
Polar has secured a strategically placed site in the Southwestern region of Norway. With a history of manufacturing, this is an ideal facility to convert into data center space.
Data Center DAL01
-
Electronic access control
-
CCTV
-
24 x 7 secured building
-
High permitter fences
-
Alarm system with AI detection
Security
-
Energy capacity: 20 MW operational. Additional 100 MW available
-
Energy source: 100% hydro power
-
Design: 2N Utility power. N+1 Electrical Infrastructure planned. River water cooling and heat re-use. N+2 Fan Wall or or direct liquid cooling options for HPC
-
Target PUE: 1.10
Specification
-
Location: NO5 region | 35km from Bergen
-
Plot: 19’000m2 of industrial space
-
Built-out state: Existing industrial building. Primary electrical infrastructure operational. Ready for fit out to client requirements.
-
Office space: 1’500m2 of existing office space
Facility
-
Electronic access control
-
CCTV
-
24 x 7 secured building
-
High permitter fences
-
Alarm system with AI detection
Security
-
Energy capacity: 20 MW operational. Additional 100 MW available
-
Energy source: 100% hydro power
-
Design: 2N Utility power. N+1 Electrical Infrastructure planned. River water cooling and heat re-use. N+2 Fan Wall or or direct liquid cooling options for HPC
-
Target PUE: 1.10
Specification
-
Location: NO5 region | 35km from Bergen
-
Plot: 19’000m2 of industrial space
-
Built-out state: Existing industrial building. Primary electrical infrastructure operational. Ready for fit out to client requirements.
-
Office space: 1’500m2 of existing office space
Facility