

Current Locations
Delivering Next Generation AI Infrastructure
Polar operates sustainable data centers optimized for AI and high performance computing. We specialize in creating energy-efficient facilities powered from renewable sources, serving the growing demands of AI and technology companies across Europe.
If these data centers are of interest please reach out using the button below.

-
On-site security operations center with patrols 24x7x365
-
Access control with biometric scanning
-
Internal and external video surveillance
-
Building and power management systems
-
White and grey space fire suppression systems
Security
-
Energy capacity: 40MVA, in development
-
Energy source: 100% hydro power
-
Design: Redundant Utility Power. N+1 Electrical Infrastructure
-
Free cooling. Rear door heat exchangers or direct liquid cooling options for HPC
-
Target PUE: 1.12
Specification
-
Location: NO2 region | 219km from Oslo
-
Plot: 60,600 m²
-
Highly connected and resilient interconnectivity
-
Built-out state: In phased development
-
Office and Storage: Flexible options
Facility

-
On-site security operations center with patrols 24x7x365
-
Access control with biometric scanning
-
Internal and external video surveillance
-
Building and power management systems
-
White and grey space fire suppression systems
Security
-
Energy capacity: 100MW total
-
Energy source: 100% hydro power
-
Design: Redundant Utility Power. N+1 Electrical Infrastructure
-
Free cooling. Rear door heat exchangers or direct liquid cooling options for HPC
-
Target PUE: 1.12
Specification
-
Location: NO1 region | 85km from Oslo
-
39,000 m2 site
-
Built-out state: Pre-design phase
-
Office and Storage: Flexible options
Facility

-
On-site security operations center with patrols 24x7x365
-
Access control with biometric scanning
-
Internal and external video surveillance
-
Building and power management systems
-
White and grey space fire suppression systems
Security
-
Energy capacity: 250MW total
-
Energy source: 100% hydro power
-
Design: Redundant Utility Power. N+1 Electrical Infrastructure
-
Free cooling. Rear door heat exchangers or direct liquid cooling options for HPC
-
Target PUE: 1.12
Specification
-
Location: 113km from Manchester
-
32,500 m2 site
-
Existing building
-
Built-out state: Pre-design phase
-
Office and Storage: Flexible options
Facility



